Archive for November 2016
Mary, Star of the Sea ELC – turf
Our 2016 work at the Mary, Star of the Sea ELC was to install synthetic turf in two large areas at the preschool. What was special about this job was the work under the turf safety surface that involved fixing the existing issues with drainage and flooding. IPR Hawaii was able to resolve these issues…
Read More